▌ Commit (today) · ▌ Actual (yesterday) · the small left figure is what remains for the month and ticks down as you enter actuals. Saves automatically.
| Metric | HVAC | Plumbing | Electrical | |||
|---|---|---|---|---|---|---|
| Commit | Actual | Commit | Actual | Commit | Actual | |
| CCMTGL Opps Booked | 93 left | -87 left | -44 left | |||
| DSRTGL Opps Ran | 103 left | -27 left | -26 left | |||
| SMTGL Opps Flipped | 57 left | 8 left | 6 left | |||
| LCTGL's Ran | 56 left | 0 left | 5 left | |||
| LCMarketed Leads Ran | -7 left | 8 left | 8 left | |||
| LCTotal Leads Ran | 50 left | 8 left | 14 left | |||
| LCNumber of Jobs Sold | 20 left | 16 left | 4 left | |||
| LCSold Revenue | $239,511 left | $60,556 left | $10,952 left | |||
| IMJobs Completed | 28 left | 10 left | -11 left | |||
| IMInstall Rev Complete | $379,679 left | $54,555 left | $25,088 left | |||
| CCMTotal Calls | 256 left | 36 left | 7 left | |||
| DSRCalls Ran | 282 left | 142 left | 42 left | |||
| DSRDemand Calls Ran | 181 left | 97 left | 107 left | |||
| DSRFVP Maint Calls Ran | 122 left | 74 left | -51 left | |||
| DSRCOD Maint Calls Ran | 6 left | -8 left | 0 left | |||
| DSRPre-sold Calls Ran | -30 left | -22 left | -13 left | |||
| DSRWarr Call Backs Ran | ||||||
| DSRConverted Calls | 142 left | 108 left | 57 left | |||
| DSRConversion Rate % | 42% | 41% | 52% | 52% | 60% | 60% |
| DSRHCC Conversion % | 100% | 100% | 67% | 25% | 100% | 100% |
| SMCompleted Serv Rev | $118,785 left | $131,322 left | $47,770 left | |||