▌ Commit (today) · ▌ Actual (yesterday) · the small left figure is what remains for the month and ticks down as you enter actuals. Saves automatically.
| Metric | HVAC | Plumbing | Electrical | |||
|---|---|---|---|---|---|---|
| Commit | Actual | Commit | Actual | Commit | Actual | |
| CCMTGL Opps Booked | 97 left | 24 left | -5 left | |||
| DSRTGL Opps Ran | 110 left | 69 left | 13 left | |||
| SMTGL Opps Flipped | 36 left | 9 left | 5 left | |||
| LCTGL's Ran | 42 left | 4 left | 5.1 left | |||
| LCMarketed Leads Ran | 41 left | 26 left | 4.9 left | |||
| LCTotal Leads Ran | 82 left | 30 left | 11 left | |||
| LCNumber of Jobs Sold | 27 left | 19 left | 6 left | |||
| LCSold Revenue | $349,210 left | $117,427 left | $33,226 left | |||
| IMJobs Completed | 31 left | 17 left | -1 left | |||
| IMInstall Rev Complete | $401,784 left | $123,273 left | $23,197 left | |||
| CCMTotal Calls | 280 left | 225 left | 98 left | |||
| DSRCalls Ran | 313 left | 298 left | 116 left | |||
| DSRDemand Calls Ran | 39 left | 241 left | 79 left | |||
| DSRFVP Maint Calls Ran | 286 left | 85 left | 40 left | |||
| DSRCOD Maint Calls Ran | -2 left | -4 left | -1 left | |||
| DSRPre-sold Calls Ran | -15 left | -24 left | -2 left | |||
| DSRWarr Call Backs Ran | ||||||
| DSRConverted Calls | 102 left | 204 left | 63 left | |||
| DSRConversion Rate % | 43% | 46% | 73% | 63% | 60% | 25% |
| DSRHCC Conversion % | 50% | 50% | 100% | 100% | 67% | 33% |
| SMCompleted Serv Rev | $45,151 left | $259,236 left | $47,148 left | |||