▌ Commit (today) · ▌ Actual (yesterday) · the small left figure is what remains for the month and ticks down as you enter actuals. Saves automatically.
| Metric | HVAC | Plumbing | Electrical | |||
|---|---|---|---|---|---|---|
| Commit | Actual | Commit | Actual | Commit | Actual | |
| CCMTGL Opps Booked | 56 left | -46 left | -86 left | |||
| DSRTGL Opps Ran | 81 left | -15 left | -53 left | |||
| SMTGL Opps Flipped | 43 left | 7 left | -3 left | |||
| LCTGL's Ran | 56 left | -4 left | -4 left | |||
| LCMarketed Leads Ran | -22 left | -12 left | -9 left | |||
| LCTotal Leads Ran | 34 left | -15 left | -13 left | |||
| LCNumber of Jobs Sold | 25 left | 13 left | 2 left | |||
| LCSold Revenue | $196,430 left | $18,004 left | $45,042 left | |||
| IMJobs Completed | 29 left | 7 left | -40 left | |||
| IMInstall Rev Complete | $293,030 left | $24,431 left | $43,840 left | |||
| CCMTotal Calls | 132 left | 70 left | -13 left | |||
| DSRCalls Ran | 243 left | 147 left | 29 left | |||
| DSRDemand Calls Ran | 102 left | 120 left | 15 left | |||
| DSRFVP Maint Calls Ran | 166 left | 69 left | 21 left | |||
| DSRCOD Maint Calls Ran | 2 left | -4 left | 0 left | |||
| DSRPre-sold Calls Ran | -27 left | -38 left | -8 left | |||
| DSRWarr Call Backs Ran | ||||||
| DSRConverted Calls | 88 left | 65 left | 14 left | |||
| DSRConversion Rate % | 59% | 26% | 75% | 56% | 64% | 40% |
| DSRHCC Conversion % | 50% | 0% | 100% | 33% | 100% | 0% |
| SMCompleted Serv Rev | $90,059 left | $72,949 left | $5,941 left | |||